Harman Newsroom Careers Contact


search

Browse our library of curated global use case stories, showcasing our pioneering solutions categorized by vertical application in written or video format. Take an in-depth tour inside real-world examples of how HARMAN Professional’s advanced audio, video, control, and lighting technologies are transforming industries throughout the world. Each case study includes the challenge the customer was facing, the solution that resolved their issue, and the impact that the finished result had on the customer.

Zouk, Singapore Nightclub
November 13, 2017

The Challenge: When Zouk Singapore, Asia’s number one nightclub, moved to its new location, it needed help planning lighting systems that would adhere to local conservation restrictions. Zouk’s owners turned to Martin by HARMAN to help design solu...


Las Vegas Race and Sports Book Casino
March 15, 2017

The Challenge: Remo Minor, Manager of Sound and Video Communications at a prominent Las Vegas casino, was in search of a solution to replace an older, maxed out, and problematic system in the resort’ s Sports Book. The popular venue features 100 i...


University of Arkansas-Little Rock
March 15, 2017

The Challenge: The principal objective of the project was to provide a high-definition session monitoring and quality records archival management system for multiple simulated patient surgical suites at the UALR School of Nursing. The system would...


Juniper Network, California
March 15, 2017

The Challenge: Juniper was engaged in a more traditional design for its project but decided to reevaluate in order to maximize the conferencing experience and rein in the budget, says Joey D’Angelo, Vice President, Charles M. Salter Associates, Sa...


IALD in Prague
January 25, 2017

Martin by HARMAN sponsors IALD convention in Prague – the awesomeness of cutting-edge dynamic architectural lighting Once every second year, architectural lighting designers from around the globe gather to spend two inspirational days demonstratin...


National Australia Bank
December 13, 2016

The Challenge This National Australia Bank project fundamentally changed the way the Audio Visual industry operates: Where AV and video-conferencing systems were traditionally bespoke and required specialist skills to deliver, National Australia B...


Sheffield University’s Networked AV Powered by
November 21, 2016

The Diamond Building at Sheffield University achieves new advantages with HARMAN technology. Networked AV solutions scale from smaller teaching spaces to the largest lecture theaters, creating powerful and efficient education environments.


HARMAN Technology at the TU/e
November 09, 2016

TU/e commissioned a comprehensive refurbishment of its auditorium and lecture theaters. Sitting at the heart of the solution, AMX Enova DGX control and distribution technology has been used to connect the complex’s 16 lecture theaters and central ...


HARMAN Technology at the Tu/e Interviews
November 08, 2016

An interview with Maurice Megens of TU/e, Teun Boselie of MK2 and Marco Thiele of AMX on the AMX control system intalled at TU/e.


Innovative Connected Campus Solution at the
November 08, 2016

The Eindhoven University of Technology (TU/e) commissioned a comprehensive refurbishment of its auditorium and lecture theaters. Sitting at the heart of the solution, AMX Enova DGX control and distribution technology has been used to connect the c...


Marriott Courtyard, Salt Lake City
September 29, 2016

The Challenge: The Marriott Courtyard in downtown Salt Lake City was designed to boast a modern look and an impressive variety of amenities to address the needs of Business and Leisure travelers as well as conference and banquet clients. The objec...


Frankie's Sports Bar, Texas
September 29, 2016

The Challenge: As Frankie’s Ft. Worth (also known as the Sundance Square location) was prepping to open in the spring of 2011, they were just as eager to embrace the “fan favorite” reputation of their sister site uptown. What would a top sports ba...


Tower at St George Wharf, United Kingdom
September 20, 2016

The Challenge: As the tallest exclusively residential building in the United Kingdom, The Tower is a focal point on the skyline of London’s south bank. Designing an automation and control solution befitting this newly iconic residence would requir...


Highlands Residence
September 20, 2016

The Challenge: The owners of this luxury home were seeking a state-of-the-art wireless home automation system that would provide a multitude of entertainment options and also the ability to remotely monitor the residence with convenience and ease....


3 Merchant Square – London
September 20, 2016

The Challenge: Beginning with a highly coveted location in London’s west end, 3 Merchant Square was designed to be a premier residential tower where luxury is the standard. With so much offered by one of the city’s most vibrant and dynamic neighbo...


ArtsQuest Center
September 20, 2016

The Challenge: Design and implement a superior audio and digital media distribution solution to support the four-story, 65,000-square-foot ArtsQuest Center at SteelStacks performing arts center. The solution needed to flexibly distribute digital a...


Royal Danish Opera
September 20, 2016

The Challenge: The first challenge presented itself to Finnish Designer, Mikki Kunttu, early on in the process: How creative was he allowed to get within the context of the Swan Lake ballet? Ballet as a genre is traditionally connected with elemen...


Shanghai North Bund Opera Week
September 20, 2016

The Challenge: The setting on the banks of Huangpu River in Shanghai is a scene full of splendor with the beautiful stage design, world class skyline, and top performers. Delivering a memorable acoustic experience in an outdoor setting not typical...


Folie Terrace, Tirana Albania
September 20, 2016

The Challenge: Folie Terrace, Albania’s largest nightclub located in the capital city of Tirana, has a striking architectural design with a massive refurbished interior and unique retractable roof used to convert the space from outdoor to indoor a...


Campus Hotel Hertenstein, Switzerland
September 20, 2016

The Challenge: This idyllic landscape gives no indication of the level of state-of-the-art technology that resides within. The Solution: Built 150 years ago on the Hertenstein Peninsula in Weggis, Switzerland, the Campus Hotel Hertenstein welcomed...